| Course Name |
PDH |
Date |
Author/Speaker |
Type |
| Truss Design and Construction |
1.5 |
Aug-18 |
Thomas R. Meyer, PE, SE |
Webinar |
| Long Span Bridges [B18] |
0 |
Apr-19 |
Jeff Smith, PE ; Robert Magliola, SE, PE ; Samantha Kevern, PE ; Dennis Heckman, PE |
NASCC,WSBS |
| Preserving Long Span Bridge Suspension Systems |
0 |
Apr-19 |
Joshua D. Pudleiner; Barry R. Colford |
WSBS |
| Long Span Steel Bridges [B4] |
0 |
Mar-17 |
Gregor Wollmann; Thad Kosmicki; Martin Furrer |
NASCC |
| Erecting a 300-ft Span Roof Truss Without Shoring [N77] |
0 |
Apr-16 |
William Merrell; Jeff Minter |
NASCC |
| Truss Design and Construction: Did I Consider Everything? [N1A] |
0 |
Apr-16 |
Derek Beaman; Scot Armbrust; |
NASCC |