| Presentation Title |
Author |
| A Potential Framework for Exploiting the Benefits of High-Toughness Steel |
Ryan Sherman, PhD - University of Nevada, Las Vegas |
| Accelerated Bridge Construction of the Shore Line Bridge, Boston |
Phineas Fowler, PE - Louis Berger |
| Advances in Design of Noncomposite Longitudinally Stiffened Steel Box Section Members for Bridge Construction |
Ajinkya Lokhande - Georgia Institute of Technology |
| An Overlooked Aspect of Accelerated Bridge Construction, Protecting the Forest on a Pedestrian Trail |
Patrick Gallagher - Parsons |
| BNSF Railroad Truss Bridge—Oklahoma City |
Sue Tryon, PE - Benham Design, LLC, Dennis Noernberg - W&W/AFCO Steel |
| Bridge Design and Economics |
Karl Svaty, PE, SE - MKEC Engr. Consl., Inc. |
| Bridge Topcoats in Japan: Toward a 100 Year Coating System |
Winn Darden - AGC Chemicals Americas |
| Broadway Bridge Tied Arches |
Natalie McCombs, PE - HNTB |
| Case Study of Long Span Steel Bridge Stability During Design And Construction |
Susan Steele - High Steel Structures, Kevin Sear, PE - AECOM |
| Construction of the Lewis and Clark Cable-Stayed Bridge over the Ohio River |
Marcos Loizias, PE - JACOBS |
| Delaware River Bridge Fracture: Repair Strategy and Monitoring by Digital Image Correlation |
Theodore Zoli, PE - HNTB Corporation, Ashley Thrall, PhD - University of Notre Dame |
| Delaware River Turnpike Bridge Fracture Repair |
Frank Corso, PE - New Jersey Turnpike Authority, Richard Schaefer, PE - HNTB Corporation |
| Design and Construction of Steel Transit Bridge Structures in the Context of a Large Design-Build Project |
Gregory Shafer, PE - Parsons, Ross Burhouse, PE - Dewberry |
| Designing and Constructing the Nation’s First Completely Stainless Steel Bolted Splice |
Jason Provines, PE - Virginia Department of Transportation |
| Distortion of Steel Plate Girders Due to Hot-Dip Galvanizing |
Caroline Bennett, PhD - University of Kansas |
|
Extending Maximum Length of Folded Steel Plate Girder Bridge System to Beyond 100 ft
|
Atorod Azizinamini, PhD, PE - Florida International University |
| Fit-Up Considerations for Steel I-Girder Bridges |
Domenic Coletti, PE - HDR |
| Galvanic Corrosion of ASTM A1010 Steel Connected to Dissimilar Metals |
Isaac Groshek - AECOM |
| I15 Capitol/Cedar Interchange–Helena, MT |
Dustin Hirose, PE - HDR, Stephanie Brandenberger - MDT Bridge Bureau |
| Innovative Steel–Concrete Composite Solutions for Bridge Girders: Recent Developments / Implementation in Poland |
Riccardo Zanon - ArcelorMittal Europe |
| Inspection Intervals for Fracture—Critical Steel Bridges Based on Fatigue and Fracture Life-cycle Cost Assessment |
Hussam Mahmoud, PhD - Colorado State University |
| Launching Three Trusses over the BNSF Northtown Rail Yard |
Martin Furrer, PE, SE - Parsons |
| Navigation Modeling and Preliminary Design of the Smithland Bridge |
Taylor Perkins, PE, Tony Hunley, PhD, PE, SE - Stantec Consulting Services Inc |
| Nondestructive Testing and Materials Analysis of the PA/NJ Turnpike Connector Bridge |
Francesco Russo, PhD, PE - Michael Baker International, Thomas Murphy, PhD, PE - Modjeski & Masters |
| Polyaspartic Coatings: Reducing the Cost of Shop Painted Steel Bridges Through Improving Shop Painting Efficiency |
Ahren Olson - Covestro LLC, Ronnie Medlock, PE - High Steel Structures |
| Rehabilitation of Collision Damaged Beams Using Heat Straightening for I-66 over Route 29 |
Alireza Hedayati, PE - WSP|Parsons Brinckerhoff |
| Replacement of the Historic Greenfield Bridge, Using Steel to Reflect the Past and Meet the Needs of Today |
Anthony Ream, PE - HDR, William Beining, PE - HDR |
| Replacing Saskatoon's Historic Parker Truss "Traffic Bridge" |
Murray Johnson, PE - COWI North America |
| Replacing the Aging US 52 Mississippi River Bridge |
Greg Hasbrouck, PE - Parsons |
| Sellwood Bridge Replacement Project |
Eric Rau, PE - T.Y. Lin International |
| Standard Manufacturable Steel Orthotropic Deck Solution |
Sougata Roy, PhD - Sougata Roy, LLC |
| Successful Installation of ABC Demonstration Project in Ohio Using SPS Bridge Decks Proposed MassDOT Rapid Short Span Bridge Replacement |
Rolando Moreau, M.Eng., P.Eng - SPS North America |
| The Benefits of Performing a Geometric Nonlinear Analysis for Curved Bridges During Erection |
Paul Biju-Duval - The University of Texas at Austin |
| The New Champlain Bridge |
Marwan Nader, PhD, PE - T.Y. Lin International |
| The New Johnson Street Bridge-A Unique Bridge in a Unique Project |
Keith Griesing, PE - Hardesty & Hanover |
| Toronto Fort York Pedestrian Bridges—The First Duplex Stainless Steel Bridges in North America |
Juan Sobrino, PhD - PEDELTA |
| When Aesthetics Govern: Pedestrian Bridges and Architecturally Exposed Structural Steel |
Terri Boake - University of Waterloo |